MARSHALL & WILLIAMS TECHNOLOGY

N-Dura

Stenters

Legendary performance. Unmatched reliability.

A heavy-duty stenter platform engineered for high speed, high pull, precise thermal processing and years of dependable service across textile, nonwoven and technical-web applications.

200 m/min

Maximum Series 2000 chain speed

3.8 m

Standard widths

8,000 hrs

Typical interval between chain relubrication

1920

M&W heritage

The customer outcome

Run faster. Pull harder. Maintain less.

Stenter performance is limited when chain stability, rail wear, airflow, heat distribution or access for maintenance cannot keep pace with production demands.

N-Dura combines Marshall & Williams heavy-duty engineering with optimized aerodynamics and controls for high output, repeatable quality and long service life.

Talk with an N-Dura specialist ↗

Series 2000 chain & rail

The industry benchmark for robust, high-speed tentering.

The Series 2000 system pairs more than 90 years of tenter-chain expertise with engineered materials, rolling rail support and controlled lubrication.

01

High-speed capability

Speeds up to 200 m/min with loads of 25 N/mm and above.

02

Long lubrication interval

Periodic relubrication at approximately 8,000 operating hours.

03

Reduced rail wear

Ball-bearing rolling action minimizes power consumption and wear.

04

Stable geometry

Laser-cut plate and extruded rail resist thermal distortion.

05

Chain choices

Clip, pin and combination versions are available.

06

Smooth transitions

Spring-steel rail joints enable consistent web movement.

Configured for your process

Build the stenter range around the web and finish.

Application

Open-width knit, woven, nonwoven and technical webs

Chain system

Series 2000 clip, pin or combination configurations

Overfeed

Up to 60% for open-width knit systems

Working width

Standard to 3.8 m; wider options available

Chemical application

Coating, saturation and foam options

Heating source

Steam, thermal oil or gas burners

Heat recovery

Integrated or stand-alone systems

Range control

Compass control center with remote diagnostics

Applications

Proven across demanding materials and markets.

01Open-width knits

02Woven fabrics

03Technical textiles

04Nonwovens

05Denim

06Coated webs

Marshall & Williams heritage

More than a century of stenter engineering.

M&W began building stenters in 1920 and became part of Navis TubeTex in 2000. The technology continues to advance through Navis engineering, manufacturing, controls and lifecycle support.

1920

Stenter production begins

2000

Becomes part of Navis TubeTex

01

Application review

02

Range engineering

03

Manufacturing

04

Installation

05

Commissioning

06

Service & parts

Discuss your application

What must your next stenter deliver?

Share your material, working width, production speed, entering moisture, heating source and required finishing process. We’ll help configure the right system.

Name