200 m/min
Maximum Series 2000 chain speed
Legendary performance. Unmatched reliability.
A heavy-duty stenter platform engineered for high speed, high pull, precise thermal processing and years of dependable service across textile, nonwoven and technical-web applications.
200 m/min
Maximum Series 2000 chain speed
3.8 m
Standard widths
8,000 hrs
Typical interval between chain relubrication
1920
M&W heritage
The customer outcome
Stenter performance is limited when chain stability, rail wear, airflow, heat distribution or access for maintenance cannot keep pace with production demands.
N-Dura combines Marshall & Williams heavy-duty engineering with optimized aerodynamics and controls for high output, repeatable quality and long service life.
Series 2000 chain & rail
The Series 2000 system pairs more than 90 years of tenter-chain expertise with engineered materials, rolling rail support and controlled lubrication.
01
Speeds up to 200 m/min with loads of 25 N/mm and above.
02
Periodic relubrication at approximately 8,000 operating hours.
03
Ball-bearing rolling action minimizes power consumption and wear.
04
Laser-cut plate and extruded rail resist thermal distortion.
05
Clip, pin and combination versions are available.
06
Spring-steel rail joints enable consistent web movement.
Configured for your process
Application
Open-width knit, woven, nonwoven and technical webs
Chain system
Series 2000 clip, pin or combination configurations
Overfeed
Up to 60% for open-width knit systems
Working width
Standard to 3.8 m; wider options available
Chemical application
Coating, saturation and foam options
Heating source
Steam, thermal oil or gas burners
Heat recovery
Integrated or stand-alone systems
Range control
Compass control center with remote diagnostics
Applications
01Open-width knits
02Woven fabrics
03Technical textiles
04Nonwovens
05Denim
06Coated webs
Marshall & Williams heritage
M&W began building stenters in 1920 and became part of Navis TubeTex in 2000. The technology continues to advance through Navis engineering, manufacturing, controls and lifecycle support.
1920
Stenter production begins
2000
Becomes part of Navis TubeTex
01
02
03
04
05
06
Discuss your application
Share your material, working width, production speed, entering moisture, heating source and required finishing process. We’ll help configure the right system.